Blog

Insights on AI-powered planning, field operations, and compliance across the energy sector.

Blog

Build vs Buy Software: The Real Cost of Each Path in Industrial Operations.

Building software has never been easier, and most builds still miss. A look at what build vs buy really costs operations leaders in oil and gas, chemicals, and utilities, and the four questions that actually decide it.

Jun 23, 2026
Blog

What should trigger an in person supplier HSE audit?

An in person audit is expensive, so it should be saved for situations where documents alone are not enough to judge the risk. Sending an auditor to a…

Jun 16, 2026
Blog

How do you link equipment tags to procedures, drawings, and qualifications?

The equipment tag is the one identifier that procedures, drawings, work orders and maintenance records all share, which makes it the natural way to link…

Jun 9, 2026
Blog

Digital Procedures: What Works, What Doesn’t, and How the Tools Compare

What to look for in a digital procedures platform for oil and gas, chemicals, and energy. Covers field execution, PDF vs step by step, offline access, AI authoring, and a comparison of Intelex, Interface, and Microsoft Power Platform.

Jun 5, 2026
Blog

How can historical incidents inform a worker’s pre job risk review?

Most sites have years of incident and near miss reports that would be very useful before a job, but nobody has time to search them, so the lessons sit…

Jun 5, 2026
Blog

How do you complete and sign permits at remote sites without connectivity?

Remote sites often have no reliable signal, so a permit system that needs a connection to sign or approve simply stops working where it is needed most…

Jun 2, 2026
Blog

What happens when two people make conflicting changes while offline?

When two people work offline on the same job, there is a real chance they both record something for the same step, and the system needs a clear rule for…

May 28, 2026
Blog

How can procedure AI distinguish a changing calculation from a genuine reason to revise a step?

Some values in a procedure are supposed to change every time, like mud weights, volumes or pressures calculated for a specific well or job. Those should…

May 26, 2026
Blog

When is a focused pilot better than replacing an entire enterprise platform?

A focused pilot is usually better than replacing an entire enterprise platform when the problem is specific, like slow permits or procedures nobody…

May 18, 2026
Blog

What evidence and architecture documents does an enterprise AI security review need?

Most enterprise AI security reviews ask for a description of the architecture and data flows, where data is stored and processed, which third party…

May 7, 2026
Blog

How do you turn equipment alerts into maintenance work orders?

Alerts from condition monitoring or control systems are only useful if someone acts on them, and when they arrive as emails or dashboard warnings they…

May 5, 2026
Blog

How do you apply different vetting requirements to low, medium, and high risk vendors?

Not every vendor needs the same level of review, and applying the full HSE assessment to a low risk supplier wastes time for everyone while slowing down…

Apr 30, 2026