SIMOPS conflicts are hard to spot in lists because the risk depends on location, like a lift over a live line or hot work near a vent. When active work is shown in 3D, people can see when two jobs are close together in a way that a list of permits never shows.
The system can also check for conflicts automatically, based on rules the site defines for which kinds of work cannot happen near each other. Interface flags these combinations before the work is approved, and seeing the conflict in 3D makes it much easier for the coordinator to decide how to sequence the two jobs.